Inspections Required

REQUIRED INSPECTIONS

 

Deck:

Signs:

Piers 42" Deep Inspection

Post Holes Inspection / Electrical Inspection

Frame, Guard Rails Inspection

Under Slab:

Final Inspection

Electrical Inspection

Carpentry:

Plumbing Inspection

Rough Inspection

Air Duct Inspection

Final Inspection

Electrical Residential:

Concrete Slab:

Service Inspection / Underground

Pre-Pour / Moisture Barrier Inspection

Rough Inspection

Final Inspection

Final Inspection

Concrete Wall / Initial or Extension:

Electrical Commercial/Industrial:

Pre-Pour Inspection

Service Inspection

Final Inspection

Under Slab / Underground Inspection

Driveway:

Rough Inspection

Pre-Pour Inspection

Ceiling Inspection

Final Inspection

Final Inspection

Fence:

Elevator:

Post Holes Must Be 36" Deep

State Required Semi Annual Inspection

The finished side should face toward your neighbor. 

Thompson Elevator (847) 296-8211

Final Inspection

Plumbing:

Garage:

Waste - Vents Inspection

Slab/Footing Inspection

Underground Inspection

Framing Inspection

Sewer & Water Inspection

Rough Electric Inspection

Drain Tile and Damp Proof Inspection

Final Inspection

 

General Rehab:

H.V.A.C.:

Rough Inspection

Chimney Liner

Final Occupancy

Fire Stop

Insulation:

Fireplace/Wood Stove

Open Wall

A/C & Furnace Install / Replacement

Stairs:

Rough Inspection

Handrails 34” 

Final Inspection

Frame Inspection

 Siding:

Final Inspection

 Barrier Inspection